All Tools
📐 Patio Dimensions
m
m
Sub-base / Hardcore
Include hardcore/sub-base
mm
Typical: 75-150mm for patios
Bedding Layer
Include bedding mortar
mm
Typical: 30-50mm for slabs
Waste Removal
Calculate waste/spoil removal
mm
Usually: hardcore + bedding + slab thickness
Excavated soil expands when removed
Total Patio Area
0.00
Perimeter
0 m
Areas Added
0
🪨 Hardcore / Sub-base
Volume required 0 m³
Weight (approx) 0 tonnes
Bulk bags (850kg) 0 bags
💡 Tip MOT Type 1 weighs approx 1.8 tonnes per m³
🧱 Bedding Mortar
📦 Materials Needed
Bedding volume 0 m³
Sharp sand 0 kg
Cement (25kg bags) 0 bags
Sand bulk bags (850kg) 0 bags
🚛 Waste / Spoil Removal
Excavation volume (in-ground) 0 m³
Bulked volume (to remove) 0 m³
Weight (approx) 0 tonnes
Skip size needed -
⚠️ Remember Soil bulks up 25-40% when excavated. Always order skip/grab slightly larger than calculated.
💰 Cost Estimate
£
£
£
£
Hardcore cost £0
Sand cost £0
Cement cost £0
Skip hire £0
Total Materials £0